RDX 4 Inch Leather Weightlifting Gym Belt

€31,99
Tax included. Shipping calculated at checkout.
1 review
WBS-4FB-S
Size: S
WBS-4FB-S
Color: Black
Approved by

Product Description

Feel the power with this wide weight lifting back support belt, cut from an authentic suede cowhide leather for a tough design that lasts and lasts. The carbon fibre padding will cushion your back perfectly, the wide coverage ensures that you get both abdomen and back support when you need it, the expertly engineered lining will get rid of sweat to keep you nice and dry, whilst the hard as nails buckle will give you a secure fit when you’re lifting or stacking. This belt is solid enough to perform under any pressure but it never compromises on comfort.

  • Made with authentic suede cowhide leather for durability and resilience
  • Special carbon fibre padding for improved support and stress reduction
  • 4” wide power belt for the perfect back and abdomen coverage during your workout
  • QD-1™ inner lining with moisture management to keep you dry and healthy
  • Dual-prong roller buckle with advanced double-stitching for secure fit
Shipping & Return Policy
Delivery
  • Delivery within Europe will be within 4-5 working days.
  • For delivery rates of heavy items to your destination, please click here.
Returns
  • In case you are not satisfied with the product or due to any other reason, you may return the item to us for a 100% refund.
  • For returning a heavy item, a collection will be arranged at your doorstep or Prepaid return label will be provided for heavy item(s) return purpose. click here

FREE AND EASY RETURN

30 GUARANTEE DAY

EXCEPTIONAL CUSTOMER SERVICE

Size: S
Color: Black

Harness Your Inner Power

This fitness gym belt is your key to resilience! While the belt is designed with a robust leather on the outside, its middle layer encompasses suede leather + SpongeX padding to take the beating. On the other hand, the 7mm thickness ensures maximum pressure absorption. Whether you're deadlifting or cross-training, this gym belt helps you tap into the depths of your inner strength.

Cushioned Support for Heavy Training

Train with total protection and less stress on your lower back. Our lifting belt for heavy-weight training provides a 4-inch fitness gym belt with SpongeX cushioning in the back, resulting in tailored lumbar support. Not only does this protect your skin from painful digging but also allows for better lower back posture.

Pushing Limits to Greater Heights!

With a reinforced adjustable roller buckle made from high-quality industrial-grade steel, pushed into place with durable twin prongs, and fastened with reinforced rivets, you have the ultimate support system to ensure a reliable grip throughout the workout. Plus, no worries about slipping or riding - this double-strength combination will lend maximized support during a workout.

Achieve Serious Gains

Forget fidgeting to figure out the perfect size the dual-pronged buckle ensures a snug fit on any of the 10 precision-drilled holes. Plus, theres even an added leather flap that provides extra cushioning between you and your belts metal buckle. So if you're looking for a gym belt that won't let you down mid-lift, grab one of these!

Unrivaled Comfort and Wearability!

Lift your game up! With a suede leather inner, they provide both comfort and durability withstanding any squats, deadlifts, or other workouts that are thrown their way. And not only do they provide long-term use, but also wick away sweat to keep athletes dry during strenuous activities, allowing them to stay comfortable no matter how hard they're pushing themselves.

The Best Workout Buddy

Gym lifting belts are essential for any dedicated gym-goer, whether you're a grizzled pro or a novice. Not only is it a dependable piece of sporting gear that allows you to safely power through even the most testing exercises, but its design is versatile enough to cater to both men and women.

FAQ's

What does a weightlifting belt do?

Primarily, it helps to support the back and keep it in a neutral position. This is especially important when lifting heavy weights as it can help to prevent injuries. Additionally, the belt can help to increase the pressure in the abdomen and intra-abdominal cavity. This increased pressure can help to stabilize the spine and pelvis, which can lead to more efficient movement and more weight lifted.

How to wear a lifting belt?

Start by simply placing the belt around your midsection easily and comfortably. The belt should rest above your hip bone. Make sure it doesn't make you feel restricted. After you have adjusted the belt, slightly inhale to tighten the belt. It should be tight enough to allow your stomach to expand. Then breathe and expand into the belt to ensure it’s tight and secure.

When should I wear it?

There are no strict guidelines as to when you should or shouldn't wear a gym belt. Some people prefer to only wear a belt during heavy lifts, while others wear one all the time. The key is to experiment and find what works best for you.

How tight should my lifting belt be?

It depends on the exercise. For squats and deadlifts, the belt should be tight enough that you can't pull it more than an inch or so away from your waist. For other exercises, like bench pressing, the belt should be tight enough that you can only fit two fingers between the belt and your waist. Just make sure it is not restricting your breathing, you should be able to expand into the belt.

How to choose the right size for me?

In order to choose the right size of the belt, measure around the tors or belly button. Moreover, all weight-lifting belts are displayed with a size chart to choose from. So, whenever you are looking to buy a lifting belt for sale, make sure to consult the size chart and choose one according to your waist size.

How wide is this belt?

Our weightlifting belt is 4 inches wide to provide optimal support and stability during your heavy lifts.

Is this only for heavy lifting as well or for medium lifting?

No, a weightlifting belt is not only for heavy lifting. A belt can be used for any weightlifting exercise where you want to add an extra level of support and stability to your core. This includes exercises such as squats, lunges, deadlifts, and bent-over rows.

Is this belt only for men or for women also?

Weightlifting belts are designed to help support the back and increase intra-abdominal pressure while lifting weights. And although they are more popular among men, weightlifting belts can be beneficial for women too. So buy gym belt now and enjoy heavy lifting!

  • 5 stars: 1 (100%)
  • 4 stars: 0 (0%)
  • 3 stars: 0 (0%)
  • 2 stars: 0 (0%)
  • 1 star: 0 (0%)
P
Pedro Miguel Carapinha Gonçalves Rosa (Portugal)
L / Black

Qualidade 5 estrelas

Recently viewed products

Describe your recently viewed products here